Our company has supplied the Ferrovie group since 1985, carrying out the following work:
Work carried out includes:
Works | Location | Year |
---|---|---|
Replacement of 3 refrigeration systems at the IMC premises at Via Fratelli Bressan 43. | Milan | 2016 |
Contract for the operation, management, maintenance and upgrading of central heating and air conditioning systems, compressed air production systems and pumps for the fire prevention system at the IMC ETR premises in Via Rucellai. | Milan | 2015/2018 |
Executive design and execution of technological plant to supply the washing and painting systems at OMCL. The work carried out involved the design and installation of a superheated water boiler inside the existing central heating unit, with a capacity of 1550 kW, along with feeder tubing on pipe racks, and heat exchanger to heat the water for washing. Feeder tubing for the heat exchanger to heat the painting system, starting with the main manifold for the distribution of fluid. Execution of associated electrical systems, with a new control panel. | Foligno (PG) | 2013/2014 |
Replacement of water-based refrigeration units at the ACS Cabin Electronics Room in the Cabin Offices and in Warehouse 2 at the Direzione Operazioni Tecniche Linea ETR I.M.C. at Via Triboniano, 220. | Milan | 2006 |
Execution of a heat-panel system for the under-floor wheel lathe building, and installation of aerothermal heating at PMC in Milano San Rocco. | Milan | 2004 |
Replacement of boilers 2 and 3 by superheated water units, each with capacity of 1744 kW, for use in the central heating system at ETR 500 in Via Rucellai. | Milan | 2003/2006 |
Works | Location | Year |
---|---|---|
Contract for the operation and maintenance, third party responsibility and efficiency maintenance of technical systems within the jurisdiction of the MILANO LINEE NORD lines and the DOMO 2 international hub. | Gallarate, Varese, Domodossola | 2004/2006 2014/2015 |
Contract for the operation and maintenance, third party responsibility and efficiency maintenance of technical systems within the jurisdiction of the ex-RTM lines in Brescia. | Treviglio, Bergamo, Brescia | 2006/2015 |
Contract for the operation and maintenance, third party responsibility and efficiency maintenance of technical systems within the jurisdiction of the ex-RTM lines of Milan's Linee SUD. | Milan, Vigevano, Lodi | 2006/2015 |
Refurbishment of air conditioning and cooling systems on the 4th floor of the Cabina ACEI at Milano Centrale station. | Milan | 2005 |
Operation, monitoring and efficiency maintenance of air conditioning systems for buildings in the NODO local division of Milan. | Milan | 2002/2006 |
Contract for the operation, monitoring and efficiency maintenance with third party responsibility for the technology systems (heating, air conditioning, water) within the jurisdiction of the LINEE NORD. | Monza, Como, Lecco, Bergamo, Sondrio | 2001/2015 |
Via Vanoni, 90 A-B 23100 Sondrio (SO) Italia
phone. +39 0342 214101
fax. +39 0342 513910
This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.
7, Résidence Rami Rue Sebta 2° Etage,
Bureau n. 8 - 20360 Casablanca (MA)
phone: +212 661-907628
This email address is being protected from spambots. You need JavaScript enabled to view it.